Create a RACI matrix online
Enter roles and tasks and assign with a click who does the work, who decides, who is consulted and who is informed. The tool checks the matrix and exports it as an image, Excel file or PDF.
This free generator creates a RACI matrix right in your browser: for each task you set who does the work (R), who is accountable (A), who is consulted (C) and who is informed (I). It warns when a task has no A or more than one, shows the workload per role and includes templates for a software rollout, campaign, event and office move.
How it works
- Pick a template or start emptyLoad a matching template or enter your own roles and tasks.
- Assign responsibilitiesClicking a cell cycles through R, A, C, I and empty.
- Check the warningsEvery task needs exactly one A and at least one R. The tool shows where that is missing.
- Export or shareAs PNG for slides, as an Excel file, as PDF or as a table straight into Word and PowerPoint.
What do R, A, C and I mean?
A RACI matrix assigns roles to every task in a project. It makes clear who does something, who answers for it in the end and who is only involved. That prevents duplicate work and gaps in decisions.
| Letter | Meaning | Rule of thumb |
|---|---|---|
| R – Responsible | does the work | at least one role per task |
| A – Accountable | owns the outcome and signs off | exactly one role per task |
| C – Consulted | asked beforehand, gives input | as many as needed, as few as possible |
| I – Informed | kept up to date on the result | as needed |
Frequently asked questions
Can a task have more than one A?
No. Exactly one role is accountable. Several As mean nobody feels responsible, which is why the tool warns.
Can the same role be R and A?
Yes, that is common for small tasks. In the matrix you set A, because the accountable role includes doing the work.
How do I get the matrix into PowerPoint?
Either export it as PNG and insert it, or choose “Copy as table” and paste it into PowerPoint or Word; the colours are kept.
Is the tool really free?
Yes. The tool runs entirely in your browser, without sign-up and at no cost.
Is my data stored?
Only locally in your browser, so your work is still there next time. Nothing is sent to our servers. “Share link” puts your state into the link’s address; anyone who gets the link can see it.
From a single tool to the whole plan
Describe your initiative in one sentence. PathHub AI creates the complete plan with phases, owners, schedule, budget and risks, free and without sign-up.
Create a free plan →